Feeds:
Posts
Comments

Posts Tagged ‘puppets’

In my week and a bit of Doing the Next Thing, I have failed to do various admin tasks. They are glaring at me from the planner and I will need to make friends with them next week. I’m not even going to mention the ironing.

But I do seem to have a genuine, not-seen-before, result. I managed to get my head around the term for Junior Church. That means that the other leaders will have their planning notes ahead of time. I’ve done a little of that before. But my completely new achievement is a set of visual aids for the new series (on Elijah and Elishah). They always suggest them in our On The Way materials. But when I’m planning on a Saturday evening, there isn’t usually time (or energy). I am also quite pleased with the discovery of wooden skewers to make the pictures into puppets. They slightly remind me of the characters from the Victorian style puppet theatre I had as a child.

I think we’re going to have fun with these on Sunday morning. I’m going to give different children a couple of puppets each and see if we can act it out as I read the passage. Who shall I cast as the bowl of flour, I wonder?

junior Church characters

Read Full Post »

This week I finally put into action a project that I’ve been wanting to organise ever since our friends the Rocks showed us their fantastic puppet theatre constructed from PVC plumbing pipes. After a bit of internet research we decided that we’d try and make a fairly large theatre, as we usually have two puppets in the sketches that we do in church and school.

A quick trip to our local plumber’s merchants and £34 later (after they gave us a special discount) and we had the piping for a theatre that’s about 2m high at the back, 1.4m at the front (for a kneeling adult or standing child) and 1m deep. Our plumber’s merchant didn’t advise gluing the thin-walled 32mm piping we had, so we had to cut small joining pieces to connect the T-pieces and 90 degree bends.

Yesterday morning we had one of our holiday Cake and Chat sessions. These are pretty much the same as the ones in term time, except they start later (for holiday lie-ins) and we have more kids with us. So we took all the pipes and connecting pieces down to the church hall, together with a couple of hacksaws, and got down to work. Rocky was the man with the saw, and we had a team which included his fiancee Bee and her mum, and various children who particularly enjoyed applying washing up liquid to the joints to make it easier to connect the pipes in.

Once we’d assembled everything, we found that the frame was still a little wobbly (especially at the beginning when we were still missing the strut for the middle of the front). We will be applying some silicone (the sort you use to line the side of the bath) to the T-pieces, which should stop the rotation that caused the wobble by fixing the connectors to the pipes.

Bee and her mum have kindly offered to make some proper curtains (today’s were a random selection from my materials box) and also a kit bag to carry the rather unwieldy piping, so we are hoping to have everything looking pukka in the next couple of weeks. I’ll blog the first official appearance of the theatre so you can see the final product.

This slideshow requires JavaScript.

Read Full Post »