Feeds:
Posts
Comments

Posts Tagged ‘builders’

Our plaster disaster is taking a while to sort out. I think we’re at 5 weeks meeting in the church hall on Sundays now. The builders have been busy removing great chunks of plaster and replacing it, and have been putting protective epoxy on some of the woodwork (I think, I wasn’t taking in the detail very well). They’ve had a lot to do – it all needs painting to match the existing decoration too. A much loved saint from our congregation went on to glory a couple of weeks ago and it would be lovely if the church could be ready for her funeral next week. I spoke to the builders as they finished yesterday and I think we’re going to be on track for finishing in time.

In the meantime, there is an enormous scaffolding structure occupying the whole of the front of the church. Our building is a great space, and pretty flexible as Victorian churches go. But getting scaffolding and builders sorted out is a lot more complicated than when there’s a bit of plaster coming down in the bathroom at home. Various brilliant members of the church have been involved in finding, contacting and appointing the contractor and organising diocesan architects and what not. The Vicar has had a hand on it all – including a trip to the top of the scaffolding. And I’ve been letting the contractors in and out for the last few days. There’s been a fair few people involved.

Next week could be a bit tight and is sure to require all hands on deck with the mops and dusters once the workers have left. We love our building, but it can be quite a lot of work. The photos are pretty rubbish, I’m afraid – but you can get an idea of the scaffolding size at least. The work is going on at the junction between the main roof (painted a shade of orange) and the wall between the nave and the chancel (a version of magnolia). Damp and ants were our problems. Hopefully the epoxy should stop the damp and the lack of damp will discourage the ants and we’ll not have anything more fall from the heights for a few years. I’m staying optimistic on this.

Read Full Post »

Vicarage life this week has been very busy with the addition of the Quinquennial builders. On Monday we spent the morning with seven workers swarming over the house, comprising our normal team of the three jolly lads, their boss & their electrician, the boiler service man AND the washing machine repair man after the laundry emerged smelly on Friday afternoon.

The main project has been painting external woodwork, and the blue I chose last week is being applied today. It’s rather more lurid than I was expecting, but I’m getting used to the cheery tone. They’ve had a cherry picker in too, to reach the eaves of the house, which is three storeys, with 10′ ceilings. Rather them than me up there wobbling about.

It’s been a bit of a hot and sticky week for them, especially for the Jolly Lad who’s been doing the plastering in one of our attic rooms and in the bathroom. I’ve been keeping them supplied with ice lollies as well as coffee.

So here are a few shots to update you on how things are looking:

Read Full Post »

This week our Quinquennial work started. Our Victorian vicarage needs a fair bit of patching up and the diocese very kindly pay for it to be sorted out every five years. The work was identified back in February and we now have three cheery lads stripping paint, sanding things and generally working their socks off to make us look respectable. They’re taking advantage of the good weather to work on the outside stuff just now. All the indoor bits should be done next week.

The photos aren’t great, but they give you an idea of the work that’s begun. More will follow next week as our exterior paintwork changes from faded red to a marine/navy blue. Most of it’s grey just now as they’ve now put the primer on.

I am making a good few cups of coffee and tea. On Thursday I gave them lollies as it was stinky hot by the end of the afternoon.

The woodshed (aka garage) door loses its red paint

Rather blurry picture of the van. This cheery lad spent most of Friday high in the air (we've 3 storeys) painting our eaves.

Read Full Post »